Free OEE calculator
Work out OEE (overall equipment effectiveness) for one machine or line from a shift’s minutes and unit counts. You get availability, performance and quality, and where the lost minutes went. It runs in your browser. Nothing you enter is stored or sent.
- Planned production time
- Run time
- Availability
- Performance
- Quality
- OEE
Where the planned time went
- Downtime loss
- Speed loss
- Quality loss
- Fully productive time
Estimates for planning only. Results depend entirely on the numbers you enter and on how you define downtime and good units. They are not an audit of your equipment or professional advice.
How OEE is calculated
OEE multiplies three rates. Availability is the share of planned time the machine ran. Performance is how fast it ran compared with its ideal speed. Quality is the share of units that were good. The calculator works in minutes, so it converts the ideal cycle time from seconds to minutes first.
Planned production time = shift length − planned breaks
Run time = planned production time − unplanned downtime
Availability = run time ÷ planned production time
Performance = ideal cycle time × total units ÷ run time
Quality = good units ÷ total units
OEE = availability × performance × quality
The lost minutes split the same way. Downtime loss is the unplanned downtime. Speed loss = run time − ideal cycle time × total units. Quality loss = ideal cycle time × (total units − good units). What is left, ideal cycle time × good units, is fully productive time. The four add up to planned production time, and fully productive time ÷ planned production time gives the same OEE. The OEE formula guide explains each loss and how to cut it.
A worked example
Example inputs, not real data
One 480-minute shift has 30 minutes of breaks and 45 minutes of unplanned downtime, including a 20-minute changeover. The ideal cycle time is 20 seconds a unit. The machine made 1,050 units, and 1,008 of them were good.
- Planned production time = 480 − 30 = 450 minutes; run time = 450 − 45 = 405 minutes
- Availability = 405 ÷ 450 = 90.0%
- Performance = 20 seconds × 1,050 units = 350 minutes; 350 ÷ 405 = 86.4%
- Quality = 1,008 ÷ 1,050 = 96.0%
- OEE = 0.9 × 0.8642 × 0.96 = 0.7467, or 74.7%
- Lost time: downtime 45 minutes, speed loss 405 − 350 = 55 minutes, quality loss 42 units × 20 seconds = 14 minutes. Fully productive time is 1,008 × 20 seconds = 336 minutes, and 336 ÷ 450 = 74.7%.
Use the Load example button above to run these figures. Here speed loss is the biggest loss, so look at slow running and short stops before breakdowns. If downtime comes mostly from changeovers, setup time reduction is the place to start, and the scrap rate and first pass yield guide covers the quality side.
Frequently asked questions
Should setups and changeovers count as downtime?
Count them if you want OEE to show the time they cost. Including them makes setup time visible in the score, which helps when you work on setup reduction. Whichever you choose, use the same rule every week so the numbers compare.
Why is my performance above 100%?
The ideal cycle time you entered is slower than the machine really runs. Ideal cycle time is the fastest time the machine can make one unit, not a standard with allowances built in. Use the design speed or the best rate you have seen over a sustained run.
Should time with nothing to run count against OEE?
No. If nothing was scheduled, add that time to planned breaks so it is left out of planned production time. OEE measures losses during the time you meant to produce.