Scrap rate and first pass yield: formulas and examples

The scrap rate formula is scrap rate = scrapped units ÷ units processed × 100, where units processed is every unit that went through the step, good or bad. First pass yield (FPY) is the share of units that came through right the first time, with no scrap and no rework: FPY = (units processed − scrapped − reworked) ÷ units processed.

Scrap rate tells you what you threw away. First pass yield tells you how much work went right without help, which makes it the better measure of a process. Below are the formulas for scrap rate by units and by cost, rework rate, first pass yield and rolled throughput yield, a worked example across four steps, and a simple way to track defects so the same ones stop coming back.

The formulas

Scrap rate (units) = scrapped units ÷ units processed

Scrap rate (cost) = cost of scrapped units ÷ total cost of production

Rework rate = reworked units ÷ units processed

First pass yield = (units processed − scrapped − reworked) ÷ units processed

Rolled throughput yield = FPY of step 1 × FPY of step 2 × … × FPY of the last step

  • Units processed: every unit that went through the step in the period, good or bad.
  • Scrapped: units thrown away or sold as salvage.
  • Reworked: units that failed and were repaired or run again. They ship, but they did not pass the first time.
  • Cost of a scrapped unit: its material plus the labor and machine time spent on it up to the point it was scrapped.

At a single step, FPY = 1 − scrap rate − rework rate. Rolled throughput yield (RTY) is the chance a unit gets through every step with no scrap and no rework.

Worked example: 1,000 brackets through four steps

Example inputs, not real data. The brackets, costs and defect counts in this article are made up to show the method.

A shop starts 1,000 steel brackets through cut, machining, weld and paint. Each step reports what came in, what it scrapped and what it reworked.

StepUnits inScrappedReworkedGood outScrap rateFPY
Cut1,0001009901.00%99.00%
Machining99020309702.02%94.95%
Weld9705259650.52%96.91%
Paint9658409570.83%95.03%

Final yield is 957 good brackets out of 1,000 started, 95.7%, and the overall scrap rate is 43 ÷ 1,000 = 4.3%. Those look fine. Rolled throughput yield tells a different story:

RTY = 99.00% × 94.95% × 96.91% × 95.03% = 86.6%

Only about 87 brackets in 100 went through all four steps without being scrapped or touched again. The rest cost rework labor, handling and machine time that never shows up in final yield. Machining has the lowest first pass yield, so it is the step to look at first.

What scrap really costs

Scrap is not just the material. A bracket scrapped at paint carries the material plus the labor and machine time of every step before it. In the example, material is $12 a bracket, and each step adds labor and machine time: $3 at cut, $9 at machining, $6 at weld and $4 at paint.

StepCost in a bracket when scrappedUnits scrappedCost of scrap
Cut$1510$150
Machining$2420$480
Weld$305$150
Paint$348$272
Total43$1,052

Counted at material cost only, the same scrap is 43 × $12 = $516, less than half the real figure. By units, cut (10) looks worse than paint (8). By cost, paint ($272) costs almost twice as much as cut ($150), because a painted bracket has every step in it. Rank scrap by cost, not by count.

Total spent on the batch: material for 1,000 brackets ($12,000), cutting 1,000 ($3,000), machining 990 ($8,910), welding 970 ($5,820) and painting 965 ($3,860), $33,590 in all. Scrap rate by cost = $1,052 ÷ $33,590 = 3.1%.

Now add the rework. At $5 a bracket at machining, $4 at weld and $3 at paint, it is 30 × $5 + 25 × $4 + 40 × $3 = $370. Scrap and rework together cost $1,052 + $370 = $1,422 on this batch, about $1.49 for each of the 957 good brackets.

If the scrapped parts went through your bottleneck, the loss is bigger still: those machine hours could have made good parts you could sell. The OEE formula shows how scrap turns into lost quality time on a machine.

How to track scrap so you can act on it

A scrap rate for the whole plant tells you there is a problem, not where it is. Record each loss with enough detail to sort it later:

  • Date, order number and part number
  • Work center and operation where the defect was found, and where it was made if that is different
  • Quantity scrapped and quantity reworked
  • A defect code from a short, fixed list, for example out of tolerance, porosity, paint run, scratch, wrong material
  • The cause, if known: machine, method, material, operator or measurement
  • Supplier and lot, when purchased material is involved
  • Whether it was one of the first pieces after a changeover

Keep the code list short and add “other” with a note. When “other” keeps growing, add a code. Scrap on the first pieces after a changeover is often a setup problem, and the fix belongs in setup time reduction, not in more inspection.

Make a Pareto of defects

Each month, add up scrap and rework by defect code, sort from largest to smallest and keep a running total. Rank by cost when the parts differ a lot in value. In the made-up shop, a month’s 100 defective units look like this:

Defect codeUnitsShareRunning total
Out of tolerance4646%46%
Porosity3131%77%
Paint run1212%89%
Scratch77%96%
Wrong material33%99%
Other11%100%

Two codes make up 77% of the defects. Work on those before anything else.

What to do about repeat defects

A defect that comes back across several orders is a process problem, not bad luck. Work it through four steps:

  1. Contain it. Check the parts already made, in stock and on their way to customers.
  2. Find the root cause. Keep asking why until you reach something you can change: a worn fixture, an unclear drawing, a material lot, a missing gauge.
  3. Fix the process, not the part. A new fixture, a gauge at the machine, a changed program or a corrective action from the supplier.
  4. Check that it worked. Watch the code for the next few orders. If it is gone, write the fix into the routing or the work instruction.

When the cause is purchased material, record the supplier and lot so it counts on the supplier scorecard, and bring repeat problems with bought-in parts to your monthly purchased-parts review.

The Lab’s production planning software has a Quality control page that tracks scrap, rework, first-pass yield, inspections and the defects that keep coming back, from the shop-floor reports and inspection results you enter or import from Excel or CSV files. Its Cost optimization page sets estimated cost against actual cost for each order.

Common mistakes

Counting reworked units as good first pass

A reworked part ships, so it is tempting to count it as good. Do that and machining in the example shows (990 − 20) ÷ 990 = 98.0% instead of 94.95%, and the 30 parts fixed by hand disappear from the numbers. Track rework as its own count.

Measuring in units when cost matters

Unit counts treat a $15 bracket at cut the same as a $34 bracket at paint. When parts or steps differ in value, rank by cost, including the labor and machine time already spent.

Switching the denominator

Some people divide scrap by good units instead of units processed: 43 ÷ 957 = 4.5% rather than 4.3%. Either can work if you say which, but switching between them from month to month makes the trend meaningless.

Counting only what final inspection finds

Parts scrapped at the machine and dropped in the bin never reach final inspection. Record scrap where it happens, with a code, or the worst step looks clean.

Planning with a guessed scrap allowance

If your bills of materials carry a scrap allowance, set it from the measured rate for that part. Too low and orders come up short; too high and you tie up cash in material. See what MRP is for how that allowance flows into planned orders.

Do you know which defect costs you the most?

The Lab’s Quality control page shows scrap, rework, first-pass yield and the defects that keep coming back, from the reports your team already fills in.

Frequently asked questions

How do you calculate scrap rate?

Divide the scrapped units by the units processed at that step, good and bad, and multiply by 100. For cost, divide the cost of the scrapped units, including the labor and machine time spent on them, by the total cost of production.

What is the difference between first pass yield and final yield?

Final yield counts every good unit that ships, including units that were reworked. First pass yield counts only units that were right the first time, so it shows the rework that final yield hides.

What is rolled throughput yield?

The first pass yields of every step multiplied together. It is the chance that a unit gets through the whole process with no scrap and no rework.

Should reworked parts count as good?

They count as good output, but not as first pass. Track rework separately so it does not hide inside a good yield number.

What is a good scrap rate?

It depends on the process, the material and the part, so there is no single figure to aim for. Track your own rate by work center and defect code, and cut the most costly defects first.