Statadventure Lab · Production Planning

Production planning software for small manufacturers

Plan every production order against the machines, shifts and materials you really have, and see which orders will be late while there is still time to move them. Production Planning is part of the Statadventure Lab, runs in your web browser and costs $99 a month.

Why the spreadsheet schedule stops working

If your production plan lives in a spreadsheet, on a whiteboard or in one person’s head, it works until the order book fills up. Then three problems come back every week.

  • Late orders are found too late. A job that will miss its date is noticed at its last operation, when there is no time left to resequence it.
  • No one knows true capacity. A sheet adds up hours. It does not know that one machine is out for service on Thursday, or that a setup can be skipped when the same product family runs back to back.
  • Expediting becomes the plan. The loudest customer or the missing part sets the sequence, and each rush job pushes others back without anyone seeing which ones.

Production planning software does the arithmetic for every order at once, and again whenever something changes.

What the twelve pages do

The module adds twelve pages to the Lab, under a menu of their own. They fall into four groups.

Plan the work

  • Production schedule. A Gantt chart of every operation by machine or by order, a week-by-day view, a dispatch list for each work center, and batch sizes compared with the economic production quantity.
  • Production orders. Create, release, hold, complete or cancel orders, and report progress against each operation.
  • Demand forecasting. What to make over the next 7, 30, 90, 180 or 365 days, set against the hours each work center has.
  • Materials planning. Every order marked ready, waiting or short, with the components to order. Think of it as a clear to build report for the whole schedule.

Check capacity and cost

  • Capacity planning. Load by week, the bottleneck, people by skill, priced ways to add capacity, and planned maintenance. Our guide to capacity planning in manufacturing covers the method.
  • Cost optimization. Estimated against actual cost by order and by product, and where to save.
  • Scenario simulator. The whole schedule run again with a change, such as more demand, a late supplier, a breakdown, an added shift or outsourcing, and compared with the plan.

Measure what happened

  • Overview. Orders by status, delivery performance, output against plan, load, OEE, delays with their causes, and machine stops.
  • Quality control. Scrap, rework, first-pass yield, inspections and the defects that keep coming back.
  • Reports. Eleven reports, from the daily production report to plan versus actual, to PDF, Excel or CSV.

OEE for each work center is availability × speed × quality, worked out from the reports your people enter. Our OEE formula guide explains each part.

Ask and set up

  • AI production assistant. Answers eight set questions from your plan, such as “What should we manufacture tomorrow?” Any action it proposes needs a person’s approval, and the approval is recorded.
  • Settings & integrations. Work centers, routings, people, the calendar, rates, file templates, and a record of every change and who made it.

How the schedule is built

Each operation goes on the machine in its work center that would finish it first, after the step before it and after its materials arrive. Jobs never overlap on a machine, work pauses outside shifts, planned maintenance stays clear, and a job that follows the same changeover family skips its setup. “Automatic” sequencing tries four standard rules, keeps the best and improves it. The answer comes back quickly, and it is a good sequence rather than a proven optimum. Drag an operation to pin it, and the rest is planned around it. Our production scheduling software page explains each step.

It uses the data you already have

Production Planning reads Excel or CSV files and uses what the Lab already holds, without keeping a second copy.

  • From the Lab’s import: items with costs and lead times, bills of materials, stock on hand and open purchase orders. On the Production Planning plan and on Basic, bills of materials load as a file. Planner and Growth also include the full materials planning (MRP) page. New to MRP? Start with what MRP is and how it works.
  • New for this module: work centers, routings with setup and run times, and production orders.
  • From the floor: good units, scrap, rework and hours, machine stops and inspections, typed in or imported.

Templates for all six production files are on Settings & integrations. Planner and Growth plans also have database connections.

What you get on day one

Open the live demo and all twelve pages run on a sample pumps and valves plant, with no account. Drag jobs, report progress, record a machine stop and run a scenario. What you change stays in your browser tab.

After you sign up, the sample stays on every page, marked “sample”, until your own data is ready, and it is never saved with your workspace. “Start my own plan” in Settings & integrations then gives you an empty plan to fill from the templates.

Price

Production Planning costs $99 a month whichever way you buy it.

How you buy itPriceWho it coversWhat is included
Production Planning plan, monthly$99 a month1 user, 1 workspaceThe twelve pages, plus Import your data, Data guide, Metrics and Settings. The last 10 versions of the workspace are kept, with 10 MB for saved work.
Production Planning plan, yearly$950.40 a year ($79.20 a month, save 20%)1 user, 1 workspaceThe same as monthly
Add-on to Basic ($297 a month), Planner ($850 a month) or Growth ($1,947 a month)$99 a monthThe whole team on that planThe twelve pages, as a subscription of its own: cancelling it never changes your plan.

The plan card is on the Lab’s pricing page. Compare Basic, Planner and Growth on plans and pricing, or read the announcement of Production Planning.

What it does not do yet

  • No live machine or sensor feeds. Machine status comes from what people report, or from a file an MES exports.
  • People are checked, not scheduled. A skill shortfall is flagged, but jobs are not delayed to match staffing.
  • No rolled-up cost of made components. A component you make is costed at its own item cost.
  • No check of a past forecast against actual output.
  • No price for lateness in scenarios. Late orders are shown, not turned into dollars.
  • No e-mailed or scheduled reports, and no mobile app.

Who it fits, and who it does not

A good fit

  • Plants of about 10 to 200 people, such as job shops, machine shops and contract manufacturers, that schedule in Excel or on a whiteboard today.
  • Work that flows through machines or lines you can name, with routings you can write down, even roughly.
  • A planner or operations manager who owns the schedule.
  • Teams that already use the Lab for materials or purchasing.

Not a good fit yet

  • You need live machine data or a full MES, with operator terminals on the floor.
  • Labor, not machines, limits you, and every job must go to a named person.
  • You need cost rolled up through several levels of made parts, or reports e-mailed on a timetable.

See it on a sample plant first

The live demo needs no account and shows all twelve pages on a pumps and valves plant.

Frequently asked questions

What is production planning software?

Software that decides what to make, when and on which machine, from your orders, routings, capacity and materials, and then tracks what really happened. It should show late orders while there is still time to act.

How much does Production Planning cost?

$99 a month or $950.40 a year on its own, for one user and one workspace. Basic, Planner and Growth teams can add it for $99 a month for everyone on the plan.

Do I need an ERP or the rest of the Lab to use it?

No. On its own plan you load Excel or CSV files for work centers, routings and production orders, plus items, bills of materials, stock and open purchase orders.

Does it connect to my machines?

No. There are no live machine or sensor feeds. Progress, stops and inspections come from what people enter or from files you import.

Can my whole team use it?

The Production Planning plan is for one user. For a team, add it to Planner (up to 5 users) or Growth (up to 15 users). The add-on covers everyone on the plan.

Scroll to Top