The OEE formula is OEE = availability × performance × quality. Overall equipment effectiveness is the share of the time a machine was planned to run that went into making good parts at full speed. 100% means only good parts, as fast as the machine can make them, with no stops.
You can get the same number in one step: OEE = (good count × ideal cycle time) ÷ planned production time. The three-factor version takes longer, but it tells you where the lost time went, and that is what you need to fix it. Below are the exact definitions, a worked example for one shift, how the six big losses fit, and the mistakes that make OEE look better or worse than it is.
The OEE formula
OEE = availability × performance × quality
Availability = run time ÷ planned production time
Performance = (ideal cycle time × total count) ÷ run time
Quality = good count ÷ total count
The five inputs, defined
- Planned production time: the shift length minus the time you never meant to run, such as breaks, lunch and time with no work scheduled.
- Run time: planned production time minus every stop, planned or not. Changeovers, breakdowns, waiting for material and waiting for an operator all come out here.
- Ideal cycle time: the shortest time in which the machine can make one of this part under good conditions. It is not the padded standard from your quote or your routing.
- Total count: every part the machine made in the period, good or bad.
- Good count: parts that passed the first time, with no rework. Total count minus scrap and rework.
The one-step shortcut
OEE = (good count × ideal cycle time) ÷ planned production time
Good count × ideal cycle time is the time the machine would have needed to make only the good parts at full speed. Call it fully productive time. Divide it by the time you planned to run and you have OEE. Use the shortcut to check your three-factor math: both must give the same answer.
Worked example: one shift on a CNC lathe
Example inputs, not real data. One 8-hour shift on a CNC lathe turning a pump shaft. The numbers are made up to show the method.
| Input | Value |
|---|---|
| Shift length | 480 minutes |
| Breaks and lunch (not planned to run) | 60 minutes |
| Planned production time | 420 minutes |
| Changeover to this part | 35 minutes |
| Spindle breakdown | 25 minutes |
| Run time | 360 minutes |
| Ideal cycle time | 0.75 minutes (45 seconds) a part |
| Total count | 432 parts |
| Scrapped or reworked | 12 parts |
| Good count | 420 parts |
Method 1: three factors
- Availability = 360 ÷ 420 = 85.7%
- Performance = (0.75 × 432) ÷ 360 = 324 ÷ 360 = 90.0%
- Quality = 420 ÷ 432 = 97.2%
- OEE = 85.7% × 90.0% × 97.2% = 75.0%
Method 2: the shortcut
Fully productive time = 420 good parts × 0.75 minutes = 315 minutes. OEE = 315 ÷ 420 = 75.0%. Same answer.
Where the other 105 minutes went
The gap between 420 planned minutes and 315 fully productive minutes is 105 minutes. Splitting it by factor shows where to look first.
| Loss | Minutes | Factor |
|---|---|---|
| Changeover | 35 | Availability |
| Breakdown | 25 | Availability |
| Small stops and slow cycles (360 run minutes − 324 ideal minutes) | 36 | Performance |
| Scrap and rework (12 parts × 0.75 minutes) | 9 | Quality |
| Total | 105 |
In this shift the changeover alone cost almost four times as much time as the scrap. That points you to setup time reduction before a quality project. To check your own numbers, use the free OEE calculator.
The six big losses, mapped to the three factors
The six big losses are a common way to sort lost time. Each one belongs to one factor, which tells you how to record it.
| Loss | Factor | Examples |
|---|---|---|
| Equipment failure | Availability | Breakdowns, tooling failures, unplanned repairs |
| Setup and adjustments | Availability | Changeovers, first-piece checks, warm-up |
| Idling and minor stops | Performance | Jams, a blocked sensor, short waits below your stop cutoff |
| Reduced speed | Performance | Running below ideal speed, worn tools, a new operator |
| Process defects | Quality | Scrap and rework during steady running |
| Reduced yield | Quality | Scrap and rework at start-up or right after a changeover |
Where a minor stop ends and a breakdown begins is your choice. Set a cutoff, for example 5 minutes. Stops longer than that are logged with a reason and count against availability. Shorter ones show up as lost performance. Write the cutoff on the sheet and keep it.
Planned and unplanned stops: what counts
The most common argument about OEE is what to take out of planned production time. One rule keeps it honest: take out only time when you never meant to run. Everything else is a loss, even if it was on the schedule.
| Time | How to treat it |
|---|---|
| Breaks and lunch, if the machine stops | Not planned to run. Leave out of planned production time |
| No orders, or no shift scheduled | Not planned to run. Leave out |
| Changeovers and setups | A planned stop, but still a loss. Counts against availability |
| Breakdowns | Unplanned stop. Availability |
| Waiting for material, an operator or an inspection | Unplanned stop. Availability |
| Planned preventive maintenance | Your choice. Leave it out or count it, but do it the same way every week |
| Short jams and slow running | Performance |
| Scrap and rework | Quality |
The Lab’s Production Planning follows the same logic. It works out OEE for each work center from the shop-floor reports and machine stops your team enters or imports from Excel or CSV files:
- Availability = run hours ÷ (run + changeover + unplanned stops)
- Speed = standard hours for what was made ÷ run hours, capped at 1
- Quality = good ÷ (good + scrap)
Time with no order is not counted as a loss, so a machine that sat idle for lack of work does not drag its score down. Idle time is a capacity question, not an OEE one. Rework is reported separately, and first-pass yield is on the Quality control page. The figures come from what people report, not from the machines themselves. See production planning software for what else the module does.
What is a good OEE score?
A figure you will see quoted is 85% as “world-class” for discrete manufacturing, built from 90% availability, 95% performance and 99% quality (90% × 95% × 99% ≈ 85%). OEE.com, a reference site on the measure, traces it to Seiichi Nakajima’s work on total productive maintenance. The same site says most plants score closer to 60%, and that no single OEE figure works as a benchmark for every company. Treat both numbers as rules of thumb, not standards: about 60% is common and 85% is very good.
The more useful comparison is a machine against itself, week by week, measured the same way. A machine that moves from 55% to 65% under the same rules makes about 18% more good parts in the same planned hours, for the same mix of parts.
Common mistakes
Using the wrong ideal cycle time
A padded routing standard makes performance look better than it is. In the example, a 0.9-minute standard instead of the true 0.75 gives performance of (0.9 × 432) ÷ 360 = 108%. A performance figure above 100% usually means the ideal cycle time is set too slow. Use the best rate the machine has held on that part, or its rated speed.
Leaving setups out of planned production time
Treat the 35-minute changeover as planned downtime and remove it, and planned production time drops to 385 minutes. OEE rises to 315 ÷ 385 = 81.8%. Nothing on the floor changed. Changeovers are a loss you can reduce, so keep them in.
Averaging OEE across machines
Take a lathe at 85% OEE over 40 planned hours and a mill at 45% over 8 planned hours. The simple average is 65%. Weighted by planned time it is (0.85 × 40 + 0.45 × 8) ÷ 48 = 78.3%. Better still, add up fully productive time and planned time across the machines and divide once.
Counting reworked parts as good
Strict OEE counts a part as good only if it passed the first time. If your sheet or tool counts reworked parts as good, track first-pass yield next to OEE so rework does not hide. Our guide to scrap rate and first pass yield shows how.
Chasing OEE on every machine
OEE on a machine that is not the constraint can rise without the plant shipping one more part. Start with the machine that limits output. If you are not sure which one that is, see how to find the bottleneck.
How to start measuring OEE with a paper sheet
You do not need sensors or software to start. A sheet on a clipboard at one machine for two weeks tells you most of what you need.
- Pick one machine, ideally the bottleneck.
- Write down the ideal cycle time for each part it runs.
- At the start of each shift, write the shift length and the break time. The difference is planned production time.
- Log every stop longer than your cutoff: start time, end time and reason (changeover, breakdown, no material, no operator, other).
- At the end of the shift, write the total count from the machine counter and the scrap and rework from the bin and the rework rack.
- Work out the three factors and the shortcut. If they disagree, one of the inputs is wrong.
- After two weeks, rank the stop reasons by minutes and work on the biggest one.
When the sheet gets too slow, move the same columns into a spreadsheet or a shop-floor report file. And before you buy a second machine or send work out, look at how much time OEE says you could win back; our make vs buy analysis covers the rest of that decision.
Want OEE by work center without the spreadsheet?
The Lab’s Production Planning works out availability, speed and quality for each work center from the shop-floor reports you load, next to the schedule they affect.
Frequently asked questions
What is the formula for OEE?
OEE = availability × performance × quality. Availability is run time ÷ planned production time, performance is (ideal cycle time × total count) ÷ run time, and quality is good count ÷ total count.
How do you calculate OEE in one step?
Multiply the good count by the ideal cycle time and divide by planned production time. It gives the same result as multiplying the three factors.
Do changeovers count against OEE?
Yes. A changeover is a planned stop, but the machine could have been making parts, so it lowers availability. Only time you never meant to run, such as breaks or no work scheduled, is left out.
What is a good OEE score?
85% is often quoted as world-class for discrete manufacturing, but it is a rule of thumb, not a standard. Compare each machine with its own past results, measured the same way.
Can performance be over 100%?
Not if the ideal cycle time is right. A performance figure above 100% usually means the ideal cycle time is set too slow.
Sources: OEE.com, Calculating OEE; OEE.com, OEE and the six big losses; OEE.com, World-class OEE.