Statadventure Lab · Planning

Demand and supply planning software

Demand and supply planning software joins the forecast of what customers will buy to the plan for what to make or buy, and when. This page explains how the two halves connect, what the software must do, and how a small or mid-size company can start.

What is demand and supply planning?

Demand planning estimates what customers will buy, by item and by period. Supply planning decides what to make or buy, and when, so that stock and capacity can meet that estimate. Demand and supply planning is the two-way link between them.

Each half is useful alone. A forecast with no purchasing plan changes nothing on the shelf, and a purchasing plan built on last year’s orders repeats last year’s mistakes. The value comes from connecting them in one loop that runs every month.

If you want depth on either side first, read our guide to demand planning software or the supply planning process. This page is about how they fit together.

How demand planning and supply planning connect

Think of one loop with five steps. The output of each step is the input of the next, and the last step feeds the first.

  1. Forecast. Demand planning produces a forecast for each item, with a range, from sales history and what you know about promotions, contracts and new customers. Our demand planning process guide covers this step by step, and demand planning methods compares the techniques.
  2. Net the requirement. Subtract stock on hand and open purchase orders from the forecast. What is left is the net requirement. This is the same logic as MRP; see what MRP is for a worked bill-of-materials example.
  3. Apply supplier and capacity limits. Round the need to the minimum order quantity, respect the lead time, and check that the supplier or your own line can deliver in that window.
  4. Review the gaps. Where the plan cannot meet the forecast, someone decides: expedite, buy elsewhere, move a customer date or change the forecast. In larger firms this is the monthly S&OP or SIOP meeting.
  5. Feed back. Actual sales and actual receipts return to the forecast. Errors and late suppliers change the next cycle.

The test of a connected system is simple. When the forecast for one item changes, you should see the purchase suggestion for that item change in the same place, without re-keying anything.

A worked example: from forecast to order

Take one item. The forecast is 1,200 units a month, which we spread as 300 a week. On hand today: 800 units. One open purchase order of 600 units is due in week 3. The supplier lead time is 6 weeks and the minimum order quantity (MOQ) is 500. For clarity there is no safety stock yet.

First project the stock week by week. Start of week plus receipts minus demand gives the end of week.

WeekStartReceiptsDemandEnd
18000300500
25000300200
3200600300500
45000300200
52000300-100
6-1000300-400

Stock first goes negative in week 5. An order placed today arrives at the end of week 6, so the net requirement is measured over the full lead time.

Gross requirement over lead time = 6 weeks × 300 = 1,800 units

Available supply = 800 on hand + 600 open PO = 1,400 units

Net requirement = 1,800 − 1,400 = 400 units

The net requirement of 400 is below the MOQ of 500, so the suggested order is 500 units. When it lands, the stock position at the end of week 6 is −400 + 500 = 100 units, which is only a third of one week’s demand.

What the plan tells you. The order of 500 covers the total, but it cannot prevent the gap in weeks 5 and 6: 100 units short in week 5 and 300 in week 6. A 6-week lead time means the order should have been placed two weeks ago. The right action is to expedite part of the order or ask the supplier to split it, and a tool should raise that exception before the shortage, not after.

With safety stock of, say, 150 units, the need becomes 400 + 150 = 550, and the order rises to 550 because it is above the MOQ. Our safety stock formula guide shows how to set that buffer from demand and lead time variation.

What demand and supply planning software must do

A demand and supply planning system earns its place only if it does these jobs in one workflow.

  • Forecast with a measured error. More than one method, ranked on held-out periods, with bias and a range, so you know how far to trust each number.
  • Net against stock and open orders. Position by item and by week, using on-hand stock and purchase orders as they are today.
  • Respect supply parameters. Lead time, MOQ, order multiples and safety stock, held per item, preferably per supplier.
  • Suggest orders and flag exceptions. Items that are short, at risk or in excess, ranked by urgency, so planners work the list instead of scanning rows.
  • Learn the real supplier. Promised against actual lead time, on-time delivery and fill rate, so the planning parameters follow what happens and not what the quote says.
  • Promise orders honestly. Available-to-promise from stock and incoming supply, so sales quotes dates the plan can keep.
  • Support the review. One view of forecast, supply and gaps that finance, sales and operations can read in the same meeting.

For the supply side of that list in detail, see our inventory planning software page.

Demand planning, supply planning, integrated tools and ERP modules compared

Four kinds of product are sold under these names. They solve different parts of the loop.

CategoryBest forGap
Demand planning onlyTeams whose main problem is forecast accuracy, with another system already creating purchase orders.The forecast stops at a file. Someone must carry it into purchasing by hand, and the two drift apart.
Supply planning onlyTeams with stable demand and a complex supplier base or bill of materials.It plans against whatever demand it is given. If that number is a guess, the plan is a precise guess.
Integrated demand and supply toolsSmall and mid-size manufacturers and distributors that need forecast, netting and order suggestions in one place.Usually lighter than an ERP on transactions: you still keep orders and invoices in your accounting or ERP system.
ERP planning modulesCompanies that already run an ERP and have staff to configure it.Forecasting is often basic, setup is long, and planners fall back on spreadsheets for exceptions.

The honest comparison is not between brands but between these shapes. For the MRP side of the ERP column, see MRP software for small manufacturers.

Signs you need integrated demand and supply planning

A small or mid-size manufacturer or distributor usually needs it when two or more of these are true.

  • The forecast lives in one spreadsheet and the reorder points in another, and nobody can say which one the buyer used.
  • You stock out of some items and carry months of others at the same time.
  • Lead times in the system differ from what suppliers really deliver, and nobody has measured the gap.
  • Sales promises dates that purchasing finds out about later.
  • The monthly planning meeting spends most of its time agreeing on the numbers instead of deciding what to do.
  • One planner holds the whole process in their head, and a holiday is a risk.

If none of these apply, a single spreadsheet may be enough for now. Be honest about it; the cost of a tool has to be less than the cost of the stock-outs and excess it prevents.

How to implement demand and supply planning in 5 steps

  1. Clean the data. One item list with unique codes, 24 months of sales by item if you have them, current stock and open purchase orders. Fix units of measure and duplicate items first, because every later step depends on them.
  2. Build a baseline forecast. Run several methods on the history and keep the one with the lowest error on periods it has not seen. Note the bias, so you know whether you tend to over- or under-forecast.
  3. Set the supply parameters. Lead time, MOQ, order multiple and safety stock per item. Start with the A items, which are the few that carry most of the sales, and use measured supplier lead times where you have them.
  4. Write exception rules. Decide what counts as short, at risk and excess, and who acts on each. For example, any A item projected to run out inside its lead time goes to the planner the same day.
  5. Hold a monthly review. Thirty to sixty minutes with sales, purchasing and operations: last month’s forecast error, the open gaps, and the decisions. Write the decisions down and check them next month.

Expect the first cycle to be rough. The value shows from the third or fourth month, when the forecast error is measured and the parameters have been corrected once or twice.

How Statadventure fits

The Statadventure Optimization Lab covers both halves in one place. It forecasts demand with six methods and ranks them on error over held-out periods, and it shows bias and 80% ranges. A replenishment planner turns that into reorder points, safety stock and suggested orders. The shortage radar sorts items into short, at risk, excess and healthy. Supplier scorecards use your purchase order history to compare promised and actual lead time, on-time delivery and fill. Order promising shows what you can commit to from stock and open purchase orders. You load items, history, stock and orders from CSV or Excel files.

It does not replace your accounting or ERP system, and it does not connect to named ERPs. The live demo is free and needs no account, so you can run the worked example above on sample data. For the wider picture, see our overview of supply chain software.

See both halves on one screen

The live demo needs no account and shows forecasting, replenishment, the shortage radar and supplier scorecards on sample data.

Frequently asked questions

What is demand and supply planning software?

Software that links a demand forecast to the plan for what to make or buy, and when. It nets the forecast against stock and open orders, applies lead time and MOQ, and flags items that will run short or sit in excess.

What is the difference between demand planning and supply planning?

Demand planning estimates what customers will buy. Supply planning decides what to produce or purchase, and when, to meet that estimate within supplier and capacity limits. Demand and supply planning connects the two.

Do small companies need a demand supply planning system?

Often yes, once the forecast and the purchasing plan sit in separate spreadsheets and stock-outs and excess stock appear together. With few items and stable demand, a spreadsheet can be enough.

Can I use this instead of an ERP planning module?

For forecasting, reorder points and order suggestions, many small firms can. You still need a system of record for orders, invoicing and accounting. Statadventure works from files you import and does not replace that system.

Sources