Setup time reduction (SMED) for small manufacturers

Setup time reduction means cutting the time a machine stands still between the last good part of one job and the first good part of the next. The best-known method is SMED, single-minute exchange of die: split the setup into internal work, which can only be done with the machine stopped, and external work, which can be done while it runs. Move as much as you can to external, then make both shorter.

You can start without a big budget. A phone camera, a stopwatch and a few hours with the operator are enough. Below is a step-by-step program for a small shop, a worked example of the hours it frees, how shorter setups allow smaller batches, and how running similar jobs back to back skips setups altogether.

What SMED is

SMED is the setup method developed by Shigeo Shingo, whose key insights on setups date from the 1950s and 1960s. “Single minute” means a single-digit number of minutes, under 10, not one minute. Treat it as a target, not a rule: a 3-hour setup cut to 40 minutes is still a large gain.

Setup time = time from the last good part of the old job to the first good part of the new job, at full speed

Measure it that way, so trial cuts, adjustments and first-piece checks count. The method has three stages:

  1. Separate internal from external work. Look for external tasks done while the machine waits: finding tools, fetching material, looking for the program or the drawing.
  2. Convert internal work to external. Preset tools off the machine, preheat a mold, stage the next fixture on a cart, load the program before the last part finishes.
  3. Streamline both. Quick-release clamps instead of bolts, locating pins instead of measuring, standard heights so no shims are needed, kits that hold exactly what the job needs.

A step-by-step program for a small shop

  1. Pick one machine. Start with the machine that limits output, or the one with the most changeovers a week. Hours freed on the constraint turn into shipped parts. On other machines they turn into smaller batches.
  2. Film one changeover from the last good part to the first good part. Keep the camera on the operator’s hands and feet, not the machine. Tell the operator why: you are studying the setup, not the person.
  3. List every step from the video with its start time and length. Walking, searching and waiting count as steps.
  4. Mark each step internal or external with the operator. For each one, ask: could this be done while the machine is still running the last job?
  5. Move external work out. Get tools, fixtures, material, gauges, the program and the paperwork ready before the machine stops. A setup cart or a kit for each part number makes this the normal way to work.
  6. Shorten the internal work. Quick fasteners, quarter-turn clamps, locating pins, preset tools, standard fixture heights and a go/no-go gauge for the first piece. Where two people can work in parallel, split the steps.
  7. Write the new standard. A one-page checklist in order, split into “before the machine stops”, “while stopped” and “after restart”. Train every operator who runs the machine.
  8. Measure every changeover for a month, then film it again and repeat. Setups drift back if no one watches the number.

Worked example: a CNC machining center

Example inputs, not real data. A CNC machining center with 8 changeovers a week, averaging 90 minutes each. The times and costs in this article are made up to show the method.

StepBefore (minutes)TypeAfter (minutes)
Find and fetch tools12External0 (kit ready before the stop)
Find the fixture8External0 (staged on a cart)
Fetch material and paperwork6External0
Load and check the program4External0 (done while the last job runs)
Remove old fixture, mount new one20Internal10 (quick clamps, locating pins)
Set tool offsets on the machine15Internal3 (tools preset off the machine)
First-piece check and adjustments25Internal17 (go/no-go gauge, fewer trial cuts)
Total9030

Moving the external work out takes the setup from 90 to 60 minutes and costs almost nothing. Shortening the internal work takes it to 30. Each changeover is now 60 minutes shorter.

Hours freed a week = 8 changeovers × (90 − 30) minutes ÷ 60 = 8 hours

That is a full shift a week. If this machine is the bottleneck, those are 8 more hours of output to sell. If it is not, the hours are better spent on more, smaller batches. Setup time is an availability loss in the OEE formula, so the gain shows up there first.

Shorter setups allow smaller batches

The batch size that costs least balances the cost of changeovers against the cost of holding the stock they create. That is the economic production quantity (EPQ):

EPQ = √(2 × D × S ÷ (H × (1 − D ÷ P)))

D is demand a year, S the cost of one changeover, H the cost of holding one unit for a year, and P the number the machine can make in a year. Take one part on the same machine: demand of 12,000 a year, a rate of 48,000 a year, a holding cost of $4 a unit a year, and $120 an hour for the machine and operator together.

BeforeAfter
Setup time90 minutes30 minutes
Cost of one changeover (S)$180$60
EPQ1,200 unitsabout 690 units
Batches a year10about 17
Average stock from batching450 unitsabout 260 units
Changeover plus holding cost a year$3,600about $2,080
Changeover hours a year for this part15about 8.7

The best batch is about 42% smaller, average stock falls by the same share, and the machine still spends less time on this part’s changeovers than before. Less stock waiting between runs also means faster turns; see how to improve inventory turnover. To try your own figures, use the free EPQ calculator.

Skip setups by sequencing changeover families

The fastest setup is the one you do not do. Group jobs that share tooling, material, color or fixture into a changeover family, and run each family back to back. Between two jobs of the same family, the setup is small or none.

Say four jobs are due this week on one machine. A and C are steel parts on fixture 1; B and D are aluminum on fixture 2. A full changeover takes 30 minutes. In the order A, B, C, D the machine changes fixtures three times after the first job: 90 minutes. In the order A, C, B, D it changes once: 30 minutes. Same jobs, an hour saved.

The catch is due dates. Holding job B back to run with D may make B late. Rules such as earliest due date or critical ratio decide which job goes first; changeover families decide which jobs go together. Our guide to production scheduling rules compares the rules.

The Lab’s scheduler does this for you. Each routing step can carry a changeover family, and when a job follows one of the same family on a machine, its setup is skipped, or cut to a share you set. Automatic sequencing scores each plan on priority-weighted late days first and changeover hours second, so lateness comes before setup savings. The Production schedule page also sets each product’s current batch against its economic production quantity. See production scheduling software for the Gantt chart and the dispatch list, and production planning software for the rest of the module.

Common mistakes

Expecting more output from a machine that is not the constraint

Hours freed on a machine with spare capacity do not ship more parts. Use them for smaller batches, or start on the bottleneck.

Timing from machine stop to machine start

The setup ends at the first good part at full speed, not when the spindle turns. Trial cuts, adjustments and scrapped first pieces belong in the setup time.

Leaving the operator out

The operator knows where the time goes. A setup study done to operators, rather than with them, misses steps and does not stick.

Cutting setup time but keeping the old batch sizes

If batches stay the same, the freed time sits idle on a machine with spare capacity and stock does not fall. Work out the batch sizes again after each round.

Buying hardware first

Quick-change tooling helps, but moving external work out costs little or nothing. Do that first, then spend money on the internal steps that are left.

No standard, no measurement

Without a written checklist and a weekly number, setups drift back to the old time.

How many hours a week do your changeovers take?

Production Planning skips setups between jobs of the same changeover family when it builds the schedule, and sets each batch against its economic production quantity.

Frequently asked questions

What is SMED?

Single-minute exchange of die, a method for cutting changeover time. You separate internal setup work, done with the machine stopped, from external work, done while it runs, move as much as you can to external, and then shorten both.

What is the difference between internal and external setup?

Internal setup can only be done when the machine is stopped, such as mounting a fixture. External setup can be done while the machine is still running the last job, such as fetching tools and material.

Does single minute mean one minute?

No. It means a single-digit number of minutes, under 10. It is a target; any large cut in setup time is worth having.

How do shorter setups reduce inventory?

Each changeover costs less, so the batch size that costs least gets smaller. Smaller batches mean less stock waiting between runs.

How do I measure setup time?

Time it from the last good part of the old job to the first good part of the new job at full speed. That includes adjustments, trial cuts and first-piece checks.

Sources: Lean Enterprise Institute, Lean Lexicon: Single Minute Exchange of Die.