Free fill rate and OTIF calculator

Work out unit fill rate, line fill rate and on-time in-full (OTIF) from a period of orders. Enter any complete pair, or all three. It runs in your browser. Nothing you enter is stored or sent.

Optional. A line is one item on an order, complete only if the full quantity was delivered.

Optional. Count an order only if it arrived complete and inside the agreed window.

How fill rate and OTIF are calculated

Fill rate shows how much of what was ordered was actually delivered. OTIF is stricter: an order counts only if it arrived complete and on time. Enter one period, using the same definitions your customer or your own team already uses.

Unit fill rate = units delivered ÷ units ordered × 100

Line fill rate = lines delivered complete ÷ order lines × 100

OTIF = orders delivered on time and in full ÷ orders in the period × 100

OTIF is usually the lowest of the three, because a short or late line fails the whole order. Measure the way the customer measures you, including the delivery window and whether a split shipment counts as complete.

A worked example

Example inputs, not real data

In one month a plant had 1,000 units ordered and 940 delivered, 200 order lines with 176 delivered complete, and 80 orders of which 68 arrived on time and in full.

  • Unit fill rate = 940 ÷ 1,000 = 94.0%
  • Line fill rate = 176 ÷ 200 = 88.0%
  • OTIF = 68 ÷ 80 = 85.0%
  • Units short = 60; lines short = 24; orders that missed OTIF = 12

Use the Load example button above to run these figures in the calculator. If fill rate is the problem, the safety stock calculator and forecast accuracy calculator can help you look at buffer and demand error.

Frequently asked questions

What is the difference between fill rate and OTIF?

Fill rate looks only at quantity, in units or in order lines. OTIF looks at quantity and timing, order by order: an order counts only if it arrived complete and inside the agreed window. That is why OTIF is often lower than fill rate.

What counts as on time and in full?

That depends on each customer’s agreement: the delivery window, whether a split delivery counts, and whether quantity is measured in units, cases or lines. Use the same rule every time you report the figure.

Do I have to enter all three pairs?

No. Enter any complete pair and the calculator will show that rate. Add the others when you have them, so you can see how unit, line and order views differ.

Related tools and reading

Want help raising fill rate or OTIF?

If the results raise a bigger question about buffers, planning cadence or how you measure service, we can help through our inventory and operations consulting. We agree the scope with you before any work starts.

Contact us
Scroll to Top