Fractional manufacturing operations

Fractional manufacturing operations, delivered remotely

Part-time help with production planning, MRP setup and shortage reviews, so purchasing and the floor work from the same plan. Work is done remotely with your team. Scope agreed before we start.

Who this is for

Production managers, master schedulers and owners of plants that have an ERP (or spreadsheets standing in for one) but do not trust the build plan.

  • MRP is switched on, but buyers plan around it.
  • The schedule changes faster than materials can keep up.
  • Shortages show up at the work center, not in a weekly review.
  • You are adding products or suppliers faster than bills of materials and lead times are maintained.

Signs you need it

  • Clear-to-build is a conversation, not a report.
  • Work orders are released, then wait for a part that planning did not see.
  • Bills of materials do not match how the product is built.
  • Lead times and lot sizes have not been revisited in years.
  • Exception messages are ignored because there are too many of them.

What we do

This is ongoing manufacturing operations support. If you only need a focused MRP clean-up, start with our MRP implementation consultant page instead.

Hands-on MRP setup and clean-up

Vendor-neutral work in your existing system: item, bill of materials, routing and supplier records, then order policies by item group.

For: Plants whose MRP suggestions are ignored, or that are turning MRP on for the first time.

Deliverables and what we need from you

Deliverables: A prioritized fix list, updated settings by item group, and a short guide for the people who maintain them.

You provide: ERP exports, and a planner or buyer who knows the parts.

Production plan versus materials

A weekly view of what you intend to build, what is clear to build, and which shortages block which products.

For: Schedulers and buyers who discover shortages too late.

Deliverables and what we need from you

Deliverables: A clear-to-build view, a shortage list tied to parent items, and a weekly review routine.

You provide: The production schedule, bills of materials, on-hand quantities and open orders.

Master data that planning depends on

Prioritized fixes to bills of materials, lead times (from actual receipts where you have them), lot sizes and order policies, starting with the items that cause the most shortages or cost.

For: Teams whose records have not kept up with the product mix.

Deliverables and what we need from you

Deliverables: A fix list by item group, values ready to load, and a named owner for each field.

You provide: Item, BOM, routing and receipt history exports.

Shortage and exception reviews

A standing session that turns MRP or planning exceptions into actions, and trains buyers and planners to run it.

For: Teams buried in exception messages or informal expedite lists.

Deliverables and what we need from you

Deliverables: A review agenda, exception-handling rules, and facilitated sessions until the team owns them.

You provide: Current exception or shortage lists, and buyer or planner time.

How a remote engagement works

We agree the item groups or lines in scope, and the cadence, before work begins.

  1. 1First conversationYour ERP or spreadsheet process, where the plan breaks, and a few parts that go wrong.
  2. 2Scope and sampleWe agree the area in scope and test a sample of items against reality.
  3. 3Fix, plan and reviewWe correct records with your team, stand up the weekly materials review and run it with your buyers.
  4. 4Hand over the routineData-quality checks, field owners and rules for overrides, so the plan does not drift.

Frequently asked questions

Do we need to buy a new system?

Usually not to start. Many plants already have MRP functions; the gap is data, settings and a review routine.

Are you a certified ERP partner?

No. We are vendor-neutral. Your ERP vendor or partner remains the right contact for licensing and technical configuration outside planning.

How is this different from inventory management consulting?

This page is about the build plan: MRP, clear-to-build and shortages. Inventory management consulting sets stock rules for purchased and finished items. Many plants need both; we keep the scopes distinct.

Can this stay remote?

Yes. We work from exports, screen shares and scheduled calls. A floor walk can be added later if a bill of materials or routing question needs it; that would be agreed separately.

What should we bring to the first conversation?

The name of your ERP, two or three parts where the plan looks wrong, and who maintains bills of materials and lead times, if anyone does.

Make the build plan worth trusting

Contact us and bring one example of a planned order or shortage your team did not see coming. Scope agreed before we start.

Scroll to Top